SiloLink uses AI to cut clash review from days to hours.


From a recent high-rise pilot
Navisworks workflow, replaced
AI-consolidated in a single pilot
From Lemlem Tilahun's four-discipline pilot
AI Clash Review
01
Cut review time from days to hours. AI consolidates thousands of raw clashes into a handful of manageable groups — review the issues, not the noise.
22,843 clashes → 103 groups
02
Stop wasting hours on false positives. AI flags irrelevant clashes — pipes brushing insulation, ducts grazing walls — so they never reach your queue again.
Auto-skip irrelevant clashes
03
Catch the issues that cause rework. Every clash gets a severity score — critical structural conflicts surface first, cosmetic overlaps stay out of the way.
Severity, ranked by AI
04
Skip the manual write-up. Turn clash groups into BCF-ready issues in one click — AI drafts descriptions, assignments, and priorities.
One click → actionable issues
05
Keep your existing BIM workflow. Export issues as BCF and hand off to Revit, BIMcollab, or Solibri in seconds.
Export BCF, hand off in seconds
On a recent four-discipline pilot, SiloLink turned 5,600 raw clashes into 140 meaningful groups with AI. What used to take me four days in Navisworks now takes less than two days.
Works with the BIM tools and formats you already use.
Book a demo and stop wasting time on false positives.
For BIM coordinators, VDC managers, and project managers
Also in SiloLink
Federated models, layered changes, and AI change summaries — keep every revision traceable across the project.
Your data is hosted safely in Europe
Stored on Google Cloud Frankfurt, Germany.
Built to meet EU GDPR requirements.